Estimate vs. Actual: The Habit That Fixes Electrical Bids

911 BOOKKEEPERS
BUILT FOR THE TRADES

An estimate is a prediction. The books record what actually happened. For most electrical contractors, the gap between the two is where profit leaks, and it is invisible unless you look.

Capture the estimate by category

Break each estimate into labor hours, materials, subcontractor costs, permits, and equipment. Store it with the job so it can be compared later.

Record actuals by the same categories

Track time against the job, ideally daily, and assign material purchases to the job. This is easier when you separate work types, as described in service vs. new construction.

Compare at completion

When a job ends, put estimate and actual side by side. Note variances over 10 percent and the reason: scope change, weather, a bad assumption, or poor productivity.

Look for patterns

After ten or twenty jobs, patterns appear. Maybe rough-in runs long, or material waste is consistently higher than assumed. Update your estimating assumptions accordingly.

Use the true labor cost

Make sure estimates use burdened labor cost, as in labor burden, not raw wages.

The bottom line

Capture estimates by category, record actuals the same way, compare at completion, look for patterns, and update your assumptions.


911 Bookkeepers works with electrical and trades contractors across the Baton Rouge metro and surrounding parishes, tying estimates to actual job costs so bids improve over time.

Your books shouldn’t be a 911 situation.

Take the free 3-minute Financial Triage and find out exactly where your business stands.

Take the Financial Triage Call (225) 274-6576

Ready to talk now? Book a free 30-minute call

← Back to all posts